2022 Sportsman 352
“Change Order”
$309,000
Was $315,000
Lantana, Florida
Price Reduced

2022 Sportsman 352 Center Console with twin Yamaha 425s, low hours less than 300, extended engine warranty, dual Garmin 22” displays, JL Audio system, loaded fishing features. Includes berth, electric bow table, dual livewells, and premium finishes.

35 ft
Length
11' 2"
Beam
2'
Draft
2022
Year
used
Condition
Fiberglass
Hull
37.8 MPH
Cruise Speed
Gas/Petrol
Fuel Type
1
Heads

Description

For Sale: 2022 Sportsman 352 Center Console – Twin Yamaha 425s Low Hours and Extended Warranty

This 2022 Sportsman 352 is a top-tier offshore center console loaded with premium features and powered by twin Yamaha 425s with digital electric steering. Built for serious performance and all-day comfort, it blends innovative tech, high-end finishes, and serious fishability.

Electronics & Helm:

  • Dual Garmin GPSMAP® 8622 MFD 22" displays
  • Yamaha Command Link Plus CL7 touchscreen
  • Garmin VHF 215 radio
  • SeaStar Maximus digital switching
  • Edson 13” stainless steel steering wheel w/ power knob
  • JL Audio M6 sound system w/ 12 speakers & dual MVi DSP amps
  • Fusion® Apollo™ stereo + remote
  • Airmar B175M CHIRP transducer

Fishing & Deck Features:

  • Dual 30-gallon pressurized aquarium livewells
  • Macerated in-deck fish boxes
  • 6 flush-mounted gunwale rod holders
  • Under-gunwale rod storage & bow storage
  • High-speed livewell pickup & sea chest
  • Dual side entry doors w/ removable boarding ladder
  • Rear insulated cooler, built-in 65 qt. lounge cooler

Comfort & Layout:

  • Triple premium captain’s chairs at the helm
  • Rear-facing seat w/ sink
  • Console berth w/ sleeping for 2 adults + child, sink, shower, & porcelain head
  • Electric-actuated bow table/sun deck
  • Wraparound bow seating w/ removable backrests
  • Fiberglass hard-top with integrated lighting, tempered glass windshield & vent
  • Sileather® premium marine upholstery

Build & Utility:

  • 355-gallon fuel tank
  • 35-gallon freshwater tank w/ washdown
  • Raw water washdown
  • Trim tabs w/ LED indicators
  • Onboard battery charging system
  • Anchor windlass system w/ 400’ line
  • Total Access bilge compartment w/ Seakeeper pod
  • SportTech® vacuum infusion hull construction
  • 10-year hull warranty

This 35’ center console is turnkey and ready for anything—whether you’re heading offshore or entertaining at the sandbar. Loaded with features, meticulously kept, and built to perform. Extended engine warranty

Technical Specifications

Year
2022
Condition
used
Category
Center Consoles
Subcategory
Saltwater Fishing
Hull Material
Fiberglass
Hull Shape
Deep Vee
Fuel Type
Gas/Petrol
Cruising Speed
37.8 MPH
Listing Type
Central/Exclusive
Share Type
Available for Co-Brokerage
Heads
1

Engine 1 (Port)

Make
Yamaha
Model
XF425NSA2
Year
2022
Type
Outboard
HP
570 HP
KW
425 KW
Fuel Type
Gas/Petrol
Hours
250 hrs

Engine 2 (Starboard)

Make
Yamaha
Model
XF425NSA2
Year
2022
Type
Outboard
HP
570 HP
KW
425 KW
Fuel Type
Gas/Petrol
Hours
250 hrs
Display Length
35'
LOA
35' 2"
Beam
11' 2"
Max Draft
2'
Bow Thrusters
Yes

Electronics and Helm

Electronics & Helm:

  • Dual Garmin GPSMAP® 8622 MFD 22" displays
  • Yamaha Command Link Plus CL7 touchscreen
  • Garmin VHF 215 radio
  • SeaStar Maximus digital switching
  • Edson 13” stainless steel steering wheel w/ power knob
  • JL Audio M6 sound system w/ 12 speakers & dual MVi DSP amps
  • Fusion® Apollo™ stereo + remote
  • Airmar B175M CHIRP transducer


Fishing & Deck Features

Fishing & Deck Features:

  • Dual 30-gallon pressurized aquarium livewells
  • Macerated in-deck fish boxes
  • 6 flush-mounted gunwale rod holders
  • Under-gunwale rod storage & bow storage
  • High-speed livewell pickup & sea chest
  • Dual side entry doors w/ removable boarding ladder
  • Rear insulated cooler, built-in 65 qt. lounge cooler


Comfort and Layout

Comfort and Layout

  • Triple premium captain’s chairs at the helm
  • Rear-facing seat w/ sink
  • Console berth w/ sleeping for 2 adults + child, sink, shower, & porcelain head
  • Electric-actuated bow table/sun deck
  • Wraparound bow seating w/ removable backrests
  • Fiberglass hard-top with integrated lighting, tempered glass windshield & vent
  • Sileather® premium marine upholstery


Build & Utility

Build & Utility:

  • 355-gallon fuel tank
  • 35-gallon freshwater tank w/ washdown
  • Raw water washdown
  • Trim tabs w/ LED indicators
  • Onboard battery charging system
  • Anchor windlass system w/ 400’ line
  • Total Access bilge compartment w/ Seakeeper pod
  • SportTech® vacuum infusion hull construction
  • 10-year hull warranty


Yacht Sales International
Your YSI Broker
+1 954.642.2080

Send a Message

YachtSalesInternational.com is pleased to assist you in the purchase of this vessel. This boat is centrally listed by DH Yacht Sales. It is offered as a convenience by this broker/dealer to its clients and is not intended to convey direct representation of a particular vessel.

The Company offers the details of this vessel in good faith but cannot guarantee or warrant the accuracy of this information nor warrant the condition of the vessel. A buyer should instruct his agents, or his surveyors, to investigate such details as the buyer desires validated. This vessel is offered subject to prior sale, price change, or withdrawal without notice.